Asphalt Paving & TonnageConstruction

Hot Mix Asphalt (HMA) Paving Tonnage, Thickness & Tack Coat Estimator

Calculate hot mix asphalt tonnage (metric tons & US tons), compacted mat thickness (wearing vs binder course), roll-down factor, and bituminous tack coat emulsion volume.

Calculated Result

Total Hot Mix Asphalt Tonnage (Metric Tons)

18.9tons

Calculator Inputs

Quick select:
Quick select:
Quick select:

Total Hot Mix Asphalt Tonnage (Metric Tons)

18.9tons

Bituminous Tack Coat Emulsion (Liters)

75 L

Uncompacted Loose Laydown Screed Depth (cm)

6.3 cm

20-Ton Asphalt Delivery Truckloads

1 trucks

Total Paving Surface Area

150 m²

Compacted Mat Volume

7.5 m³

Paving Area vs. Asphalt Tonnage Breakdown

Total Paving Surface Area
150 m²(89%)
Final Asphalt Tonnage from Plant
18.9 tons(11%)

Compacted asphalt density averages 2.40 t/m³ (145-150 lbs/cu ft). Uncompacted loose mix must be laid 20-25% thicker than final compacted grade.

All engineering calculations, structural estimates, and electrical sizing metrics are provided for preliminary estimation only. Always ensure compliance with relevant statutory building codes and occupational safety standards, verified by a certified professional engineer before practical implementation.

Calculation Methodology

Compacted Volume = Area * (Thickness / 100). Asphalt Tonnage = Compacted Volume * 2.40 t/m³ * 1.05. Tack Coat Emulsion = Area * 0.50 L/m².

Frequently Asked Questions

One metric ton of asphalt covers approximately 8.33 square meters (89.6 sq ft) at a standard 50mm (2 inch) compacted thickness.

Related Calculators

Recommended tools and calculators tailored to your current calculation

Explore all tools