Egypt Utility Smart & Coded Meter Installation Calculator 2026
Calculate survey, hardware, and connection costs for prepaid and coded electricity, water, and gas meters in licensed and informal structures under Egyptian Cabinet decrees.
Calculated Result
Total Connection & Survey Cost
2,100EGP
Calculator Inputs
Unlicensed Structure (Coded Meter with Temporary ID Number)
m²
Total Connection & Survey Cost
2,100EGP
Estimated Monthly Bill Installment (24m)
96.25 EGP
Meter Device & Configuration
1,800 EGP
Engineering Survey Fee
300 EGP
Meter Installation Cost Components
Meter Device
1,800 EGP(43%)
Inspection Fee
300 EGP(7%)
Total Installation
2,100 EGP(50%)
Installing a coded meter in an informal structure measures real utility consumption and does not confer title deeds or legal building licensing.
Official Statute: قرارات مجلس الوزراء ووزارات الكهرباء والإسكان والبترول المنظمة لتركيب ومقايسات العدادات الكودية والذكية لعام 2026Last Verified: 2026-09-04
Calculation Methodology
Aggregate cost includes hardware delivery, programming, engineering inspection, and connection fees based on property size, phase requirement, and installment option.
Frequently Asked Questions
A coded meter is an anonymous, prepaid utility meter installed in unlicensed properties identified by an account code. It automatically converts to a regular titled meter once the property finalizes statutory building reconciliation.
Related Calculators
Recommended tools and calculators tailored to your current calculation