Paver Patio, Sand & Crushed Basediy

Interlocking Paver Patio, Bedding Sand & Crushed Gravel Base Calculator

Calculate exact quantities of interlocking concrete pavers (with 10% cutting waste), screed bedding sand volume/tons (1" depth), and compacted crushed stone subbase (4" depth).

Calculator Inputs

Live Real-Time
Quick select:
Calculated ResultPaver Patio, Sand & Crushed Base

Total Concrete Pavers Needed (10% Waste Included)

1,925pavers

Compacted Crushed Gravel Base (Tons)

5.95 tons

Screed Bedding Sand (Tons)

1.4 tons

Detailed Calculation Breakdown

Crushed Base (10cm)
5.95 tons
Bedding Sand (2.5cm)
1.4 tons
Paver Units
1,925 pavers

Calculation Methodology

Total Pavers = (Patio Area m² / Single Paver Area) * 1.10. Base Crushed Stone (Tons) = Area * 0.10m * 1.70 t/m³. Bedding Sand (Tons) = Area * 0.025m * 1.60 t/m³.

Important Legal & Educational Disclaimer

Adequate plate compaction of the 4-inch crushed gravel subbase is the single most critical factor in preventing future sunken or uneven pavers.

This calculator is designed for educational and informational purposes only based on public statutory frameworks. The outputs do not constitute binding financial, tax, or legal advice. We assume no liability for decisions made based on these estimations. Always verify with the relevant official authorities or a certified professional advisor.

Frequently Asked Questions

Excessive bedding sand depth cannot be properly compacted and will shift under foot traffic or vehicle loads, causing severe rutting and uneven pavers.
Related Calculators

Related Calculators

Recommended tools and calculators tailored to your current calculation

Explore all tools